OEM / ODM Development

From a brief to a finished product: the eight steps of a custom development programme.

Most of what we ship did not exist before a client asked for it. A custom programme runs through eight steps:

Development process
1. BriefOccasion, audience, quantity, deadline, reference images or vessel data
2. ConceptProposal with form factor, materials and branding plan — free digital mock-up
3. 3D & hand sample3D modelling and a physical hand sample for proportion and feel
4. ToolingMould design and production for diecast and injected parts
5. Pre-production sampleFull-livery sample; nothing enters mass production before your sign-off
6. Mass productionBatch QC with photographic records at each stage
7. InspectionAQL inspection, optionally third-party, before packing
8. DeliveryExport packing, documentation, shipping to venue or distributed addresses

Typical timelines: samples 1–2 weeks (alloy models about a month), production 30 working days (30–45 for alloy), and 3–4 months when new tooling is needed. Launch-date programmes are scheduled backwards from the event.

What clients ask first

  • MOQ — quoted per product family
  • Tooling — developed in-house, quoted with your project
  • Sample lead time — 1–2 weeks (alloy about 1 month)
  • Production — 30 working days, 30–45 for alloy